We recommend you think very carefully about whether you want the system before applying for this Plan. We do not offer the option of having it removed.

If you change your mind before the system is installed, you’ll need to let us know as soon as possible. If we’ve already incurred some costs (for example, undertaken a site visit at your property, lodged the grid application or performed the meter exchange) we might require you to reimburse us for this, but you won’t otherwise incur any cost.

However, if you decide you want or need the system removed or relocated after it has been installed, you will need to first pay the system exit fee to purchase the system and arrange its removal or relocation at your own cost.

Did this answer your question?